Friday, 24 November 2017

First pontoons installed at Wallaroo

THE first pontoons have been installed in the Wallaroo swimming enclosure.

Sea-Slip Marine crew members have been repairing ropes damaged last month and installed the first section of the pontoon structure on Tuesday, January 24.

A second side is due to be floated in this week, with the crosspieces to come soon after.

To view full articles in the CURRENT issue click HERE and follow the prompts to subscribe to YPCT-E.
For all previous issues please contact our office on 8821 1155.

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.