Concerns over plan to dump silt in gulf

CONCERNS have been raised about a plan to dump silt dredged from Port Adelaide into Gulf St Vincent.

Flinders Ports has applied to dredge 1.55 million cubic metres of material to widen the channel at Outer Harbor by 40 metres, allowing bigger ships to pass through.

However, numerous groups have issues about dumping the waste product into the gulf.

To view full articles in the CURRENT issue click HERE and follow the prompts to subscribe to YPCT-E.
For all previous issues please contact our office on 8821 1155.

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

Kadina Travel
Bridgestone Tyre Centre
Royal Exchange Hotel
Crowell Concrete
Copper Coast Dental
Larwoods
Fraser Ellis
Minlaton Engineering
Star Of The Sea
YP Community Transport
Peninsula Plumbing
Yorke Valley Hotel
APC Kadina
Elders
Remsco
GJ east
Spiderman YP
Moonta Newsagency
Barley Stacks Wines
Optom All Vision Care
Copper Coast Garage Doors
Kadina Jewellers
Coast Road Motors
Metal As Anything
SYP Motors
Ziersch Cabinetmakers
Carers & Disability
Loctite Self Storage